  • A Fabric First Approach

    A Fabric First Approach

    Fabric First Approach, What It Is and Why It Matters!

    The fabric first approach is built on a simple principle:
    reduce heat loss from the building before upgrading heating systems or adding renewables.

    Instead of installing a high-tech heating system in a leaky home, fabric first aims to fix the building first, then optimise how it’s heated.

    Why Fabric First Became the Gold Standard.

    For years, fabric first has been the backbone of UK retrofit policy (including PAS 2035), and for good reason.

    1. It Reduces Energy Demand at Source.

    By improving insulation and airtightness, the home simply needs less heat to stay comfortable.

    • Lower energy bills.
    • Less reliance on heating systems.
    • Reduced carbon emissions.

    2. It Improves Comfort and Health

    Fabric improvements don’t just save energy, they change how a home feels.

    • Warmer surfaces (no cold walls).
    • Fewer draughts.
    • Reduced risk of damp and mould.
    • More stable indoor temperatures.

    3. It Futureproofs the Home.

    A well-insulated building works better with any heating system.

    • Heat pumps perform more efficiently.
    • Smaller systems can be used.
    • Lower running costs long-term.

    In other words, fabric first makes every future upgrade more effective.

    4. It Supports a “Whole House” Approach

    Fabric first encourages thinking about the home as a system:

    • Insulation.
    • Airtightness.
    • Ventilation.
    • Heating.

    All designed together, not as bolt-on measures.

    So Why Is It No Longer the “Only” Answer?

    Despite its benefits, fabric first is no longer seen as the universal gold standard, especially when viewed through the lens of net zero.

    This shift is strongly influenced by research such as the “Every Home Counts” review (which highlighted quality, whole-house thinking, and unintended consequences) and more recent academic work like “Fabric first: is it still the right approach?”.

    The Key Challenges.

    1. Net Zero Has Changed the Priority.

    Fabric first was developed when all heating was fossil fuel-based.

    Today, we can decarbonise heat directly using technologies like heat pumps.

    Research shows that:

    • In some homes, switching to low-carbon heating alone can achieve major carbon reductions.
    • Fabric upgrades, while beneficial, are not always essential for decarbonisation.

    2. Time and Scale Constraints.

    Deep fabric retrofit (e.g. solid wall insulation, floors, airtightness upgrades):

    • Is expensive.
    • Is disruptive.
    • Requires skilled labour.

    At current rates, rolling this out across all UK homes would take decades.

    3. Diminishing Returns.

    Many homes have already had:

    • Loft insulation.
    • Cavity wall insulation.

    What’s left is:

    • Harder.
    • More expensive.
    • More invasive.

    The cost-benefit balance becomes less attractive at scale.

    4. One Size Doesn’t Fit All!.

    The Every Home Counts review emphasised that retrofit must be:

    • Whole-house.
    • Risk-managed.
    • Tailored to the property.

    Fabric first on its own can overlook:

    • Building condition.
    • Moisture risks.
    • Occupant behaviour.
    • Ventilation requirements.

    5. Interaction with Modern Systems.

    Modern retrofit thinking recognises that:

    • Heating systems.
    • Controls.
    • Occupant use.
    • Energy supply.

    …all interact with fabric.

    Focusing only on insulation can miss quicker, lower-cost wins, such as:

    • Heating upgrades.
    • Controls optimisation.
    • Behavioural changes.

    The Current Thinking: “Fabric First… But Not Fabric Only”

    The industry is moving toward a more balanced view:

    • Do the “easy wins” first (loft, cavity, draught-proofing).
    • Upgrade heating where appropriate.
    • Plan deeper fabric improvements over time.
    • Always follow a whole-house, risk-based approach.

    As highlighted in recent research:

    • Fabric improvements still deliver lower bills, better comfort, and reduced energy use.
    • But insisting on fabric-first in every case can slow down decarbonisation efforts.

    Bottom Line.

    Fabric first is still fundamentally good building physics, reduce heat loss before adding heat.

    But it’s no longer a rigid rule.

    Today, the “gold standard” is better described as:

    A successful retrofit balances:

    • Fabric.
    • Ventilation.
    • Heating.
    • Occupant needs.

    not blindly prioritising one over the others.

  • The Why’s and Way’s of Retrofit.

    The Why’s and Way’s of Retrofit.

    A practical guide for homeowners on doing things in the right order, and for the right reasons.

    Retrofitting a home isn’t just about adding insulation or upgrading heating systems. Done properly, it’s a carefully balanced process that considers how heat, air, and moisture move through a building. Get the sequence or method wrong, and you can end up with condensation, mould, or even structural issues.

    Before we go into any details an understanding of the bits and pieces that are contained in the “Whole Process “may help you in further reading.

    The steps.

    We want to make our home warmer and possibly more efficient, so we want insulation and maybe a new heating system.

    1. Lets get an assessment done.

    A retorfit assessor will look at the whole property and make a retrofit report that details property construction, ventilation, current insulation levels and any failing that exist (damp, mould, fabric etc)

    Why?

    The assessor is not only a domestic energy assessor they also hold a qualifications in identifying property characteristics to enable a retrofit coordinator plan out a way to stage the development of retrofit in the right order.

    Why a right order?

    Whats the use of installing a new or upgrading a heating system if the heat is going to go out the window! This just means we need to control the heat loss first or we are just wasting energy.
    So first things to consider is the fabric and make up of the property, this is where the ventilation etc comes in.

    Why does the ventilation matter, arn’t we just adding more draughts into our property?

    Yes and no! The secret is “controlled ventilation

    1. Insulation: Not One-Size-Fits-All

    Different homes.

    Older properties (typically pre-1930s) are designed to breathe. Moisture moves through walls and evaporates naturally through the seasons.

    More modern homes are built with cavities that were originally built with a clear air cavity to protect the property from moisture and add some form of insulation (air can be insulation!)

    Types of property. (link to detailed post here)

    • Usually post 1930. Cavity pattern.
    • Insulation is usually injected within the structure cavity.
    • Can be polystyrene.
    • Incorrect retrofits can lead to hidden condensation and timber decay.
    • Different design and usually concrete, steel.
    • These often have non-traditional materials and detailing.
    • Require specialist assessment.
    • Insulation choices depend on structural system and existing fabric condition.
    •  Detached, single-storey, factory-built prefabricated residential home.
    • Regulated by law, typically maximums of 20m (65ft) in length and 6.8m (22ft) in width.
    • Frequently constructed with steel and timber frames, designed for durability and weather resistance.
    • Need special considerations on retrofitting especiallybelow the main deck.

    Moisture Flow & Dew Point, Why It Matters

    Warm air carries moisture. As it cools, it releases that moisture — this is where condensation forms.

    If insulation is poorly designed:

    • The dew point can happen inside the wall.
    • Moisture accumulates where you can’t see it. (causing interstatal condensation)
    • Over time, this leads to mould, damp, and deterioration

    Common Mistakes:

    • Internal Wall Insulation on a cavity wall that has already been filled. This can trap moisture within the wall because heat no longer dries it out.
    • External Wall Insulation on a home with an empty cavity (without addressing the cavity)
      The cavity can become a cold moisture trap.

    Best Practice (IWI vs EWI)

    • EWI (External Wall Insulation):
      • Keeps the structure warm
      • Reduces condensation risk
      • Preferred where possible
    • IWI (Internal Wall Insulation):
      • Used where EWI isn’t feasible (e.g. planning constraints)
      • Requires precise design:
        • Vapour control layers
        • Thermal bridging minimisation
        • Careful detailing around openings

    2. Loft Insulation: Cold vs Warm Roofs

    Loft insulation is another area where misunderstanding leads to problems.

    Cold Roof (Traditional Loft Insulation).

    • Insulation at ceiling level.
    • Loft space remains cold.
    • Requires good ventilation to remove moisture.

    Warm Roof.

    • Insulation at rafter level.
    • Loft becomes part of the heated envelope.
    • Ventilation strategy changes significantly.

    The Problem with Mixing Both!

    Installing both cold loft insulation and warm roof insulation together without design consideration can:

    • Trap moisture between layers
    • Restrict airflow
    • Lead to condensation in hidden areas

    This is a classic example of “more insulation ≠ better” if not designed properly.

    3. Ventilation: The Missing Piece.

    As insulation improves airtightness, ventilation becomes essential, not optional.

    Why It Matters.

    • Removes moisture from cooking, bathing, and breathing
    • Prevents condensation and mould
    • Maintains indoor air quality

    Matching Ventilation to Insulation.

    • Heavily insulated / airtight homes:
      • May require Mechanical Ventilation (e.g. MVHR)
    • Moderate upgrades:
      • Intermittent extract fans + background ventilation may suffice

    PIV and Internal Wall Insulation.

    Positive Input Ventilation (PIV) works by pushing air into the home to dilute moisture.

    However:

    • With Internal Wall Insulation, surfaces may be cooler behind the insulation layer.
    • PIV can push moist air into vulnerable and failed areas.
    • This can increase the risk of hidden condensation.

    Bottom line: PIV is not always suitable, especially where IWI is present.

    4. Background Ventilation: How It Actually Works

    Background ventilation (like trickle vents) is often misunderstood.

    It doesn’t just “let cold air in” it’s part of a system.

    The Principle.

    • Extract fans (kitchens, bathrooms) pull air out.
    • This creates slight negative pressure.
    • Fresh air is drawn in through:
      • Trickle vents
      • Air bricks
      • Gaps (like door undercuts)

    Why Door Undercuts Matter?

    Without gaps under internal doors:

    • Air can’t move freely through the home
    • Extract fans become less effective
    • Moisture builds up in rooms

    A Balanced System.

    For ventilation to work:

    • Air must enter, move, and exit
    • Blocking any part of this path reduces effectiveness

    Final Thoughts: Retrofit is a System, Not a Checklist

    The biggest mistake in retrofit is treating measures in isolation.

    • Insulation affects moisture movement
    • Moisture affects ventilation needs
    • Ventilation affects indoor air quality and building health

    Everything is connected.

    A well-designed retrofit:

    • Considers the whole house.
    • Follows the right order.
    • Uses the right materials for the right building.

    If you’re planning upgrades, it’s worth getting independent advice to ensure your home performs as intended , not just on paper, but in reality.

  • PAS!

    PAS!

    A Publicly Available Specification (PAS) is a document that defines good practice standards for a product, service, or process. 

    PAS 2030/2019 here. information on Pas 2035/2023 here.

    A Publicly Available Specification (PAS) is a document that defines good practice standards for a product, service, or process. 

    PAS 2035/2030 are linked frameworks that outline best practices for retrofitting homes in the UK to enhance energy efficiency. 
    While PAS 2030 focuses on the quality of the installation processes, PAS 2035 ensures that the retrofit is appropriate for the building as a whole.
    Current PAS documents can be downloaded here.

    It’s a crucial component of the UK government’s strategy to boost building efficiency and reduce carbon emissions. Adopting a “whole house” approach, PAS 2035 considers the home’s environment, occupancy, and the homeowner’s objectives, ensuring that retrofit projects address key aspects such as insulation, ventilation, occupancy, and building fabric to support long-term sustainability.

    Although not a regulation, PAS 2035 is a publicly available specification (PAS), developed to address shortcomings of previous schemes following the Each Home Counts Review.

    PAS 2035 compliance is mandatory for all publicly funded projects, including those supported by the Energy Company Obligation (ECO), and Warm Home Fund. We also have a route called licence plus which is run by Trustmark which does not need coordination as part of its process!. This is mainly aimed at self funding retrofit but using installers that are roughly following the current PAS process. Whichever mechanism is to be used, the property occupier should request details of which route the process follows pre-install.

    PAS 2035 has its strengths, but also notable limitations. If everyone in the supply chain, assessors, coordinators, designers, and installers adheres strictly to the process, the framework should work effectively.
    However, lapses in monitoring and inspection can lead to issues. Unfortunately, “technical monitoring” for most UK schemes is minimal, and no longer performed by Ofgem, meaning that failings can go unnoticed, leaving property occupiers unaware of potential problems. Hopefully this will change with future consultations. 

    The retrofit process involves a range of participants, including canvassers, lead generators, social marketeers, assessors, designers, coordinators, installers, and a limited number of technical monitoring agents. This complexity, along with regulations, updates to rules and red tape, can create confusion and drive up costs.

    The standard will transition from PAS 2035:2019 to PAS 2035:2023 in March 2025.

    Protecting the Property Occupier!

    PAS 2035 outlines several requirements for both pre and post installation stages. One of its most valuable aspects is the involvement of a retrofit coordinator throughout the process.

    The coordinator’s primary role is to safeguard the interests of the property and its occupants, ensuring the retrofit is carried out effectively and sustainably.
    In an ideal scenario, the retrofit coordinator would operate independently, free from any conflicts of interest and most importantly in my opinion has performed in the retrofit assessment area. However, this level of impartiality is often difficult to achieve in practice. 

    By understanding the processes outlined below, you’ll hopefully gain the knowledge needed to ask informed questions and engage with some confidence at various stages of your retrofit journey.

    In practice.

    If the property / occupants have met the requirements of a funded scheme, then the installation or funding company will arrange for a retrofit coordinator to instruct a visit from a retrofit assessor. The coordinator is the first in the process as this is the stage that the property classification is usually identified (traditional, non-traditional etc.)

    The assessor should try to get a picture of what the typical energy use entails and also what is expected by improving the property. Lots of photographs will be taken as an EPR (energy performance report) will be produced at the end.
    This is basically a reference EPC (energy performance certificate) but does not get published on the central register. (when EEM work is completed, a new EPC should be produced, ideally the original assessor as they will have the original data)

    Some quick guidance on what the assessment entails and why!

    • First things are age and condition. This is to allow a retrofit coordinator to classify the property and create a plan that allows a fabric first approach that works with the natural balance of the property and highlights all potential issues.
    • Existing Ventilation in wet rooms photographed and noted.
      This is because all insulation packages require moisture to be controlled post installation. Some insulation situations require upgrades due to the design and current regulations.
    • Existing background ventilation photographed and noted.
      This is because all insulation packages require the replenishment of air post installation. Some insulation situations require upgrades due to the design and current regulations. Installers may use a pulse or blower test may be performed to validate if upgrades to background ventilation are necessary.
    • Fuel burning appliances noted.
      This is especially relevant with open flued appliances like gas, wood/coal burning fires etc. Ventilation requirements for combustion may need to be installed or verified adequate, especially after extraction units have been added or improved.
    • Whole footprint of property measured, including all windows/glazed doors.
      This allows to distinguish what is a “heat loss area” in more detail, and also potential solar gains.
    • Plenty of images of outside. This is to show the condition of building elements, including damp course and drainage services (gutters, downpipes, soil pipes).

    Access to all rooms are required as is the loft space, basements and visual inspections of all external walls and areas. All ventilation present will be recorded and door undercut measurements should be taken.
    The assessment can take longer if more than one installation is being carried out, i.e. wall insulation, loft, and heating.

    A report is then generated to give a rating of the properties’ energy performance from “A (very good) to a (G) very poor”. Information is then made available to the retrofit coordinator.
    All data is uploaded to the *Trustmark data warehouse, which forms a property plan and can be accessed by involved parties.

    The coordinator will then look at all the data to see if improvements need any special design attention and intervention due to condition, age of property and location. If all looks OK then a ventilation strategy will be put in place depending on installation requirements.
    Some other documents are required, like a medium term improvement plan, which will create future scenario’s for improvements. 

    A retrofit designer will need to be consulted to design the proposed installation measure(s) if deemed necessary.
    We can take designers of certain measures as being members of a trade body. For example, a Gas Safe engineer installing a gas boiler, a SWIP trained installer performing IWI to a traditional non-heritage building, MCS accredited installer for solar and heat pumps. 

    A professional member of a Chartered Institute will be required, especially on buildings with heritage values or interacting insulation systems (wall and floor insulation being installed together, for example).
    It is up to the retrofit coordinator to validate that the designers and installers are all suitably qualified.

    * The TrustMark Data Warehouse was created to address several recommendations in the  Each Home Counts review  commissioned by the Government in 2015.

    The retrofit plan is executed.

    This is what the installers are expected to perform to meet the current PAS. Each measure (installation or improvement) will have its own route and requirements, and brief information be found on each section within this site.
    The plan will provide steps for the current and potentially future improvements. A fabric first approach should always be used, this means insulation before any heating works need to be carried out. Soft touches should also be part of the fabric first approach like heating controls, draught proofing and low energy lighting.

    The occupants should be informed of all work. It should be the co-ordinator and installers who contact the occupiers to inform them of the process that the retrofit project will follow. Dates, times, and conditions required will need to be discussed and agreed upon. 
    This may include removal of furniture to prevent damage or the arrangement of alternative living arrangements throughout the works (especially on internal wall insulation). It may include preinstall remedial works to the property structure or minor repairs like broken windows, failing of rainwater removal (poor guttering) and wall pointing.

    Get all this information in writing or in an email to reference at a later date if required. 
    Make notes of Installers contact details, coordinators, and assessors names and numbers. This can be invaluable if you need to contact anyone involved in the process.
    You can do research on installers, co-ordinators, assessors and designers here as they all need to be Trustmark registered.

    The Installation.

    Once agreed and a plan has been discussed, the installation will begin. If an insulation measure is being installed, then validation is required that either the current ventilation is sufficient or insufficient. The assessment would have highlighted any shortfalls, and the installers may ask to perform an air tightness test. This can be carried out using a pulse test, this may be performed to allow installers a way of emitting undercuts and background ventilation from the installation, but controlled ventilation is always a good way to manage moisture. 
    The ventilation should always be installed or upgraded first, or at least core vents and wiring set in place if wall insulation being installed.

    The *retrofit coordinator should make a site visit if the measure is deemed high risk which includes IWI, EWI, UFI, FRI, PHI and RIR. (*this will be a mandatory requirement from early 2025)
    The next stage will be the installation phase of the main improvements. 

    The Handover.

    Depending on the complexity of the installation, the duration can range from a single day to several weeks. This timeline should have been discussed and documented during the early planning stages.
    Before signing off on the work completed by the installation company, ensure you are fully satisfied that all agreed tasks have been completed to your expectations. Additionally, verify that any damages have been repaired or compensated. Make sure you have received all necessary handover documents, including warranties, guarantees, compliance certificates, insurance policies, gas certificates, and electrical certificates. Some certificates and warranties may come via post or email after the installation, if this is the case then ask for written clarification that they will be provided. All these documents are part of the works and may be needed if selling the property or for insurance purposes.

    Insurance Backed.

    To be PAS 2030 certified, installers must have an Insurance Backed Guarantee provider to ensure their customers are protected. They must also have adequate insurance coverage, including liability insurance, to protect homeowners.

    What is an insurance backed guarantee? Installers will provide their own written workmanship guarantee (this is very important to get a copy of in case of any poor installations). This will outline a guarantee period, during which the installer will return and fix any faults resulting from faulty workmanship.
    The insurance backed guarantee only comes into effect if the original installation company ceases trading through lets say bankruptcy!. Ask for details of the company providing the guarantee, and then do your research. 

    All Insulation installed under PAS.

    Each insulation installation will follow the same route as regards with ventilation on PAS. This should be explained by the retrofit coordinator and the installers. The basics are that background ventilation (usually trickle vents) will be provided unless an air permeability test is performed and validates the need to omit from the installation.
    Wet room ventilation is always required, but can vary with different insulation situations. (see below)
    If PIV (positive input ventilation) is being installed, then request details of why this choice is being taken, installers or retrofit coordinator will be able to guide you. (PIV will need maintenance, and it is placed in your loft space).

    Some insulation situations like the property not being 100% insulated (bathrooms and kitchens being omitted due to fixture removal difficulty) then the extract ventilation may need to be a dMEV system to mitigate risks of condensation.

    Pre-installation building inspection (PIBI)

    The Retrofit Installer should undertake a pre-installation inspection using a competent person, this means a person or persons who have relevant industry qualifications.
    The inspection shall be undertaken at a level of detail sufficient to confirm that the specified energy efficient measure can be safely and effectively installed at the designated location. Particular attention shall be given to potential moisture build up as a result of the installation and taking into account the fire safety of the dwelling and the functionality and/or safety of installed services (gas, electricity, water, telecommunications, etc.)

    Technical Monitoring.

    Technical monitoring is a form of auditing that highlights a set of given questions on compliance. This is not performed by the installation company, but they may have their own regime of quality control. The funders (energy companies) will use these reports to highlight and hopefully rectify failing. Sadly, this shows that even with all the rules and hierarchy within the process of PAS, failing still arise. More on technical monitoring here.